Diesel generator FAQs
Compare new and used generators, plan a UK installation or prepare a set for export. Start with your question or choose a topic below.
Choosing and sizing a diesel generator
What size diesel generator do I need for my business?
List the equipment that must stay on during an outage, its running kW or amps, and which items start together. Include pumps, lifts, compressors, refrigeration and UPS battery charging. A motor starting while other equipment is running can set the required size. Send the load list, supply voltage and phase to DGGB. A recent demand log is especially helpful for an existing building.
What is the difference between kW and kVA? How many kW is 100 kVA?
kW measures active power. kVA measures apparent power, which also determines how much current the alternator must carry. Multiply kVA by the rated power factor to find kW. A 100 kVA generator rated at 0.8 power factor has an 80 kW rating. Check both figures on the datasheet and compare them with your load, including starting demand.
Should I buy a prime power or standby diesel generator?
For a site relying on a generator as its regular supply, start with the prime or continuous rating that matches the load profile. For backup during utility outages, check the emergency standby rating and the manufacturer’s operating limits. For example, at 400 V three-phase the DGGB150PS is rated at 136 kVA prime and 150 kVA standby. A site needing 150 kVA prime should shortlist a different model.
Do I need a single-phase or three-phase generator in the UK?
Start with the equipment supply details. A 230 V single-phase load and a 400 V three-phase motor have different requirements. For a mixed site, list the large single-phase loads as well as the three-phase machinery. A three-phase nameplate gives the total rating across phases. The manufacturer’s per-phase limits and the way loads are distributed determine how much can run on any one phase.
How quiet is a silent diesel generator, and when do I need a canopy?
A silent or acoustic generator has an enclosure that reduces noise. Compare sound pressure figures in dB(A) at the same distance and load. A figure measured at 7 metres cannot be compared directly with one measured at 1 metre. For a site near homes, give the supplier the boundary noise limit, hours of use and proposed position. For a plant room, ask for the airflow and exhaust requirements of the open set.
How much diesel does a generator use per hour, and how long will a tank last?
Ask for the fuel curve at your expected load. For example, if the data for your set gives 25 litres per hour at that load, 500 usable litres provides about 20 hours before any additional operating reserve. Nominal tank capacity can exceed the fuel available to the engine. Allow for changing demand, refuelling access and the longest period the site needs to run unattended.
How much does a new diesel generator cost in the UK?
Compare written quotations at the same prime or standby duty. Request separate figures for the generator, enclosure, transfer switch, fuel tank, transport, offloading, electrical installation and commissioning, with VAT shown. A supply-only price and an installed backup system can be very different even at the same kVA. Send the proposed model or load, postcode and required date for a project price.
New and used automatic transfer switches
What is an automatic transfer switch (ATS) for a standby generator?
An ATS monitors the normal supply. In a typical standby system, it signals the generator to start after a mains failure and transfers the selected circuits once generator voltage and frequency are acceptable. It transfers back after the mains has stabilised. Ask which circuits it will feed, how the generator receives its start signal and what happens if the set fails to start.
What size ATS panel do I need, and should it be three-pole or four-pole?
Give the designer the mains and generator voltages, phase count, essential-load current, upstream protection and details of the earthing arrangement. Transfer switches are specified in amps. The system design also determines the required fault withstand rating and whether the neutral should switch. A generator’s kVA rating alone does not settle the specification.
Can I buy a used automatic transfer switch for an existing generator?
Yes, if a competent switchgear specialist confirms suitability. Request the nameplate, current rating, wiring diagram, controller details, service history and functional test evidence. Check spare parts availability and compatibility with the existing start contacts and protection. Compare the tested and installed cost with a new ATS panel, including any modifications and the warranty offered.
Will an ATS keep computers and controls running without interruption?
A normal open-transition ATS leaves a break while the generator starts and the transfer takes place. Equipment that cannot tolerate that break may need a UPS. Give the designer the maximum interruption each circuit can accept, how long the UPS must bridge and the UPS input demand when its batteries recharge. Check the complete sequence during commissioning.
UK generator installation and commissioning
What information is needed for a diesel generator installation survey?
Send the site postcode, load schedule, proposed generator and switchboard positions, and any single-line diagram. Useful photos show the route from the road, doors and overhead clearances, the base, cable routes, nearby windows and air intakes. Identify operating hours and the circuits that cannot be shut down. The survey can then establish access, offloading, ventilation, exhaust, fuel and electrical works.
What is included in generator installation and commissioning?
Agree the scope in writing. Installation may include siting, fuel and exhaust arrangements, cabling and switchgear. Commissioning checks how the completed system behaves. Ask for test records covering start-up, alarms, load acceptance, mains failure, transfer and return, together with the settings, drawings and handover instructions. A factory load test and an on-site mains-failure exercise answer different questions.
Can a standby generator be connected to my building’s existing electrical supply?
A competent electrical contractor should assess the switchboard, changeover equipment, earthing, protection and load. Identify any solar PV, battery storage or other generation at the site. If the generator will operate in parallel with the public network, even briefly, ask the designer to establish the network operator’s connection requirements before equipment is ordered.
Do I need planning permission or an environmental permit for a UK generator?
Check the proposed installation with the local planning authority and the relevant environmental regulator. Give them the site, duty, fuel, operating hours, noise information and rated thermal input. Electrical output in kVA is a different figure. In England and Wales, medium combustion plant and specified generator rules can apply differently to the same standby installation. Scotland and Northern Ireland have separate guidance.
Generator servicing, maintenance contracts and testing
How often should a standby diesel generator be serviced?
Use the service schedule for the specific engine and generator. Where the manual sets calendar and running-hour intervals, use whichever comes first. Even a low-hour standby set needs checks on items such as its starter batteries, charger, coolant, filters and fuel condition. Record the last service date and hour reading so the next visit can be planned against both.
What should a generator service and maintenance contract include?
Ask for an itemised scope covering scheduled visits, consumables, battery and charger checks, test runs and written reports. Clarify whether the ATS, fuel sampling, load-bank testing, breakdown callouts, travel and replacement parts are included. For a critical site, agree the response hours, attendance target, escalation contact and arrangements for temporary power during repairs.
What is a generator load-bank test and what should the report show?
A load bank applies a measured electrical load so the set can be assessed independently of the building. Agree the kW, test duration, load steps and load-bank type. Request the machine serial number, voltage, frequency, temperatures and any alarms at each stage. A resistive test demonstrates kW. A resistive-reactive test can also exercise the alternator at a specified power factor.
My generator starts on its weekly exercise. Is that enough to prove the backup system works?
A start records that the engine ran on that occasion. Check whether the test also transferred the building load, ran the generator at a meaningful load and proved the return to mains. Ask the service engineer to agree the test scope with the site team, record what was exercised and schedule any outstanding checks around operational needs.
Buying a used diesel generator
What should I check before buying a used diesel generator for sale?
Start with the stock reference and request photographs of the generator, engine and alternator plates. Match the serial numbers to the service history and test report where available. Check duty rating, voltage, frequency, recorded hours, enclosure and included accessories. Ask what the seller has inspected or repaired, what still needs attention, and which points are covered in the written offer.
How many hours is too many for a second-hand diesel generator?
There is no single cut-off. Compare the recorded hours with dated service entries and any controller replacement or overhaul history. A higher-hour prime set may have a consistent service record. A low-hour standby set may have spent years in storage. Ask for a cold-start video and recent load-test results to put the hour reading in context.
How do I compare used generator prices and calculate the total cost?
Compare machines at the same duty and electrical specification. Check age, hours, condition, service work due, test evidence and spare parts availability. Then add any ATS, tank, preparation, freight, offloading, installation, and destination taxes or charges. A cheaper ex-works generator can cost more by the time it is ready to power the site.
Can I inspect or witness-test a used genset before shipment?
Quote the stock reference and ask what the seller can demonstrate before agreeing a test. For a remote purchase, request one recording showing the nameplate, start, controller readings and the machine running under the agreed load. Agree test duration, acceptance criteria, witness arrangements and any fee in writing. A short walkaround is helpful for condition and included equipment.
Can a 50 Hz used generator supply a 60 Hz site overseas?
Buy for the voltage, phase and frequency required at the destination. Some sets have documented ratings at both frequencies. Confirmation must cover the particular engine, alternator, controls, cooling and output rating. Ask for the manufacturer’s data and a test at the required settings before shipment. Quoting the country alone can miss the requirements of imported machinery on site.
What warranty and spares should I ask for on a used generator?
Get the warranty terms in writing, including the duration, hours limit, covered parts, labour, travel, territory and claims process. Ask separately for the tested condition at dispatch and any items sold as seen. For an overseas site, use the engine serial number to check local support and request a first-service spares list with part numbers.
Worldwide generator delivery and export
Can you quote worldwide delivery for a used diesel generator from the UK?
Send the DGGB stock reference, destination country, named port or full delivery address, required arrival date and site access details. Ask for the shipping dimensions and weight of the actual machine, including loose accessories and packing. These details determine whether container, specialist freight or onward road transport is practical. Confirm the agreed route and scope on the quotation.
Will a generator fit in a shipping container?
Compare the packed length, width and height with the carrier’s actual door opening and internal dimensions. Check payload, floor loading, space for securing the skid and any accessories shipped loose. An acoustic canopy is part of the generator’s dimensions. A machine that fits inside on paper may be too tall or wide to pass through the doors.
What documents should I request when importing a used generator?
Ask for the commercial invoice and packing list with the equipment description, serial numbers, values, weights and dimensions. Confirm who arranges the export declaration, the appropriate transport document, and any required licences or origin documents. Your destination customs agent should check local restrictions, inspections, commodity classification, import duties and taxes before dispatch.
What is included in an ex-works, port or delivered generator price?
Ask for the Incoterms® rule, version and exact named place on the offer. List who loads the generator, books freight, arranges insurance, clears customs and pays terminal charges and onward delivery. A price to a named port can still leave substantial costs between the port and the site. Confirm the point where transport risk passes as well as who pays each cost.
Is UK VAT charged when a diesel generator is exported?
The treatment depends on the route, the parties and the evidence of export. A qualifying export can be zero-rated when the relevant HMRC conditions and deadlines are met. Agree the invoicing and proof of export before collection, especially if your own forwarder arranges transport. Ask a destination customs agent about import VAT and duties separately.
Who unloads the generator at my UK or overseas site?
Agree whether the quotation covers transport only, crane offload or final positioning. Give the haulier the verified lifting weight, lifting-point drawing, access width, overhead obstructions, ground conditions and distance from the vehicle to the base. Request a written delivery plan showing who supplies the lifting equipment and who receives the machine on arrival.