Generator service and maintenance contracts

A standby generator can spend months waiting for a power cut. Include the starting battery, charger, fuel and changeover equipment in the maintenance discussion alongside the engine service. For a prime-power set, running hours also shape the service plan.

Build the plan around the machine

Record the engine and generator model, serial numbers, current hours and last service date. Use the manufacturer’s time and running-hour schedule for that unit. Dust, repeated short runs and the site operating regime can affect what the engineer recommends.

Compare maintenance contract scope

Ask for an itemised schedule so the site team knows precisely what each visit includes and how additional work is authorised.

  • Oil, filters and other consumables included at each interval
  • Battery condition, charger, cooling system, belts, leaks and fuel condition
  • Generator start tests and any separate ATS or load bank test
  • Written service reports, defect quotations and agreed call-out cover

Know what the test demonstrates

A no-load start checks that the generator starts. A load bank applies a controlled electrical load and lets the engineer record performance at agreed test points. A site changeover test checks a different part of the system. Specify the evidence you need and agree the impact on building operations in advance.