Generator installation and commissioning
A successful standby installation starts with the loads that must stay on and ends with a witnessed test of the agreed operating sequence. Define who is responsible for delivery, positioning, electrical work and handover before booking the set.
Prepare for a site survey
Send a load schedule or recent demand readings, identify equipment with high starting currents and describe what should run during a mains failure. A site plan and photographs help the project team assess practical constraints.
- Access for delivery, lifting and final positioning
- Space around the set for servicing, airflow and exhaust routing
- Cable routes, changeover location and fuel delivery access
Agree the installation scope
A quotation should identify the equipment and work at each interface. Discuss who supplies the base, fuel system and switchgear, who connects the electrical installation and who arranges any planned outage. A qualified electrical designer should assess earthing, protection and changeover for the site.
What commissioning should demonstrate
Agree a test schedule covering the generator, alarms, changeover and return to the normal supply. Decide in advance whether site load, a load bank or both will be used and who needs to witness the test. Ask for the commissioning results, operating instructions and a record of agreed settings at handover.